





We promise | All customer-centric, never for short-term profit, and sell long-term benefits | ||||
We produce | Mold, prototype, injection molding, product assembly, surface printing, spraying the surface integration | ||||
Pls provide | 2D, 3D, samples, or the size of the multi-angle pictures | ||||
Mould Time | 20-35 Days | ||||
Product time | 7-15 Days | ||||
Moud precision | +/-0.01mm | ||||
Mould life | 50-100 million shots | ||||
Producing Process | Audit drawings - mold flow analysis - design validation - Custom Materials - mold processing - core processing - electrode machining - Runner system processing - parts processing and procurement - machining acceptance - cavity surface treatment process - complex mode Die - The entire mold surface coating - Mounting plate - mold sample - sample test - sending samples | ||||
Mould cavity | One cavity, multi-cavity or same different products be made together | ||||
Mould material | P20,2738,2344,718,S136,8407,NAK80,SKD61,H13 | ||||
Runner system | Hot runner and cold runner | ||||
Base material | P20,2738,2344,718,S136,8407,NAK80,SKD61,H13 | ||||
Finish | Pitting the word, mirror finish, matte surface, striae | ||||
Standard | HASCO, DME or dependent upon | ||||
Main thechnology | Milling, grinding, CNC, EDM, wire cutting, carving, EDM, lathes, surface Finish, etc. | ||||
Software | CAD,PRO-E,UG Design Time: 1-3 days (normal circumstances) | ||||
Product material | ABS,PP,PC,PA6,PA66,TPU,POM,PBT,PVC,HIPS,PMMA,TPE,PC/ABS, TPV, TPO,T PR,EVA,HDPE,LDPE,CPVC,PVDF,PPSU.PPS. | ||||
Quality system | ISO9001:2008 | ||||
Establish time | 20days | ||||
Equipment | CNC,EDM,Cutting off Machine,plastic machinery,etc plastic suitcasemould zhejiang |
Cooig.com で行われるお支払いはすべて厳格な SSL 暗号化と PCI DSS データ保護プロトコルで保護されています
ご注文品が出荷されていないか、行方不明になっている場合、または製品に問題がある場合は返金を請求してください。不良品の現地での返品は無料です。